Electrical Yard & Transmission lines
 
The power generated from the wind turbines is passed through a network of transformers, isolators, meters and then fed to the transmission lines which transmits the power upto the on-site sub station. Electrical connections between the turbines are made via on ground cables to the on-site electrical substation. These cables are laid using RSJ poles, so far as far possible, routed to follow site access tracks.